Pattern-approved AS4747 meters
Supply and install of pattern-approved meters that meet the NSW non-urban metering rules, sized and specified after a site check — not a one-size-fits-all package.
Northern Rivers farmers and irrigators: if you take water from a river, creek or bore, you may need a compliant meter by 1 December 2026.
Installed and validated by certified partners. We handle the site assessment, quote, ordering and paperwork.
Flowstate Metering helps Northern Rivers and NSW North Coast irrigators get a pattern-approved meter, telemetry and the paperwork in order under the NSW non-urban metering rules.
Supply and install of pattern-approved meters that meet the NSW non-urban metering rules, sized and specified after a site check — not a one-size-fits-all package.
Approved local intelligence devices and telemetry commissioned so data can be received through the WaterNSW DQP Portal.
We prepare the evidence pack — model and serial numbers, installation details, photos, validation and seal records — and work with the responsible certified partner so it can be lodged in the WaterNSW DQP Portal.
A documented, site-specific check of your approval or work, existing meter, pipe and flow data, and any constraints. The assessment is $200–400, and is credited if the job goes ahead.
The exact obligation depends on your work and licence, and on any exemptions. We will check before recommending equipment. This is a guide, not a compliance determination.
Coastal works at 100 ML or more generally need a pattern-approved AS4747 meter, DQP validation, and LID telemetry by 1 December 2026.
These works have until 1 December 2027, or until approval renewal if that comes first. A pattern-approved meter may be self-installed, and telemetry is optional.
You might be exempt. We will check that before recommending equipment — pipe or meter diameter alone does not settle all obligations. If you already have a meter, it may only need a logger retrofit or a validation. We check the approval, installation, condition and outputs rather than assuming a new meter is required.
We serve farmers and irrigators across the Northern Rivers and the NSW North Coast.
Flowstate Metering is based on the Gold Coast (QLD 4218) and works with licensed, certified local partners in the region. If you take water from a river, creek or bore and you are not sure whether your work is in scope, start with a conversation and a site assessment.
From the Tweed and Richmond catchments along the NSW coastal valleys. We come to the pump or bore — a meter is usually installed in the water-take, pump or bore discharge arrangement, not automatically at a property boundary.
A sole trader business run by Simon Rogers, ABN 16 907 295 655, based in QLD 4218.
We coordinate site assessments, quotes, ordering and government paperwork for NSW non-urban metering, and we work with licensed, certified local partners who do the install and validation.
Installed and validated by certified partners. Simon is booked into the Irrigation Australia CMI course on 1–2 December 2026. Course attendance is not certification — assessments follow the course — so he is not a certified meter installer or a Duly Qualified Person, and this site does not claim that he is.
Until certification is formally granted, technical sign-off and validation stay with the certified partner responsible for the work. We will tell you who holds each licence, insurance and validation responsibility on a job.
Tell us about your pump or bore. We’ll come back to you about a site assessment ($200–400, credited if the job goes ahead) and whether a qualified partner should attend.